
Webster Financial (WBS) Trading Report
Longer Term Trading Plans for WBS
- Buy WBS slightly over 45.52 target 51.38 stop loss @ 45.39
- Short WBS slightly under 51.38, target 45.52, stop loss @ 51.53
Swing Trading Plans for WBS
- Buy WBS slightly over 51.38, target n/a, Stop Loss @ 51.23
- Short WBS slightly near 51.38, target 47.39, Stop Loss @ 51.53.
Day Trading Plans for WBS
- Buy WBS slightly over 51.38, target n/a, Stop Loss @ 51.26
- Short WBS slightly near 51.38, target 47.39, Stop Loss @ 51.5.
Check the time stamp on this data. Updated AI-Generated Signals for Webster Financial (WBS) available here: WBS.
WBS Ratings for January 24:
Term → | Near | Mid | Long |
---|---|---|---|
Rating | Weak | Weak | Weak |
P1 | 0 | 0 | 39.78 |
P2 | 44.50 | 45.45 | 45.52 |
P3 | 46.49 | 47.39 | 51.38 |
AI Generated Signals for WBS

Blue = Current Price
Red= Resistance
Green = Support
Real Time Updates for Repeat Institutional Readers:
- Factset: Request User/Pass
- Bloomberg, Reuters, Refinitiv, Zacks, or IB users: Access Here.
Instructions:Click the Get Real Time Updates button below.
In the login prompt, select forgot username
Type the email you use for Factset
Use the user/pass you receive to login
You will have 24/7 access to real time updates.
Click the Get Real Time Updates button below.
In the login prompt, select forgot username
Type the email you use for Factset
Use the user/pass you receive to login
You will have 24/7 access to real time updates.
From then on you can just click to get the real time update whenever you want.
Our Market Crash Leading Indicator isEvitar Corte.
Evitar Corte warned of market crash risk four times since 2000.
It identified the Internet Debacle before it happened.
It identified the Credit Crisis before it happened.
It identified the Corona Crash too.
See what Evitar Corte is Saying Now.
Get Notified When our Ratings Change:Take a Trial
This report was produced using AI developed by Stock Traders Daily. Over the past 20 years this proprietary AI has been refined to help identify the most opportune trading strategies for both individual stocks and the stock markets themselves. This methodology is also applied to Index options, ETFs, and futures. The objective of this specific report is to optimize trading in Webster Financial (NYSE: WBS) while incorporating prudent risk controls.
Warning:
This is a static report, the data below was valid at the time of the publication, but support and resistance levels for WBS change over time, so the report should be updated regularly. Real Time updates are provided to subscribers. Unlimited Real Time Reports.
Subscribers also receive market analysis, stock correlation tools, macroeconomic observations, timing tools, and protection from market crashes using Evitar Corte.
Instructions:
The rules that govern the data in this report are the rules of Technical Analysis. For example, if WBS is testing support buy signals surface, and resistance is the target. Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly. In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.
Swing Trades, Day Trades, and Longer term Trading Plans:
This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for WBS too. All of these are offered below the Summary Table.
Instructions:
The rules that govern the data in this report are the rules of Technical Analysis. For example, if WBS is testing support buy signals surface, and resistance is the target. Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly. In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.
Swing Trades, Day Trades, and Longer term Trading Plans:
This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for WBS too. All of these are offered below the Summary Table.